Industries Served

Campus-Scale Air for Pulp and Paper

Pulp and paper mills run air for vacuum systems, machine drives, instrumentation, and broke handling, often across long piping runs spanning multiple buildings where pressure drop compounds.

Example Scale
500-3,000+ HP
Spanning multiple mill buildings
Method
Metered
kW, PSI, and CFM across long runs
Diagnostic Signals
3
Power, pressure, and flow

Operating conditions to assess

01

Finds the pressure drop

Long runs creating 10-plus PSI of drop force the whole plant to over-supply. I meter where it is lost so the fix targets the cause, not the symptom.

02

Corrosion-driven leaks

Moisture-laden environments accelerate corrosion and leak rates. The survey tags and prices the loss across the campus.

03

Unlocks the incentive

Mixed compressor fleets and underused utility incentive programs are common. I document the measured savings in the form the program needs.

Example system scale

500 to 3,000+ HP spanning multiple mill buildings

Issues to investigate
  • Long piping runs creating 10+ PSI pressure drop
  • Moisture-laden environments accelerating corrosion and leak rates
  • Mixed compressor fleets with mismatched controls
  • Utility incentive programs underutilized due to documentation burden

How I find and fund the savings here.

What happens after you ask

  1. You send a short request.

    Your name, work email, company, and a few lines about the system and the problem. Nothing else is needed to start.

  2. I reply directly.

    Expect a direct reply from Peak kW within one business day.

  3. We agree the scope in writing.

    We go through your equipment, shifts, pressure needs and electricity bills. You receive a proposal that sets the measurement boundary, deliverables, fee, site access and schedule before any work begins.

  4. I measure your system.

    My loggers record power, pressure and flow across a representative operating cycle agreed in the scope.

  5. You receive the findings and we review them together.

    A prioritized action list with estimated savings, the assumptions behind every figure, and a proposed way to verify the results.

Before the first call

Next step

Have your mill's piping-run layout across buildings ready so we can plan where to meter the pressure drop before targeting a fix.

Get Started

Ready for an assessment built around your industry?

The same metered, vendor-neutral method, tuned to the duty cycle and air quality demands of your sector.

Already have your equipment list to hand? Describe your facility first (optional)